May 15, 2016 - Road Report

Boice Bradley

  • o   Significant road improvements in the last 6-8 months.

  •  o   Recent road improvements in last 2 months

  •  o   Excellent condition from County Road 14 in to Miller’s/Preacher’s turn off

 Miller’s Lake Portion

  • Many potholes were filled in by hand last fall, but lots of new ones near the beginning of the road

    • BR to review causes with BS+G

  •  Just past Firestone’s, more wear and tear due partially to heavy rain and winter snow conditions

    • Grading required, and most likely, some more B gravel required

  • Two areas with culverts require more attention

    • The “first” culvert was repaired by hand in the fall. Needs a little more work

    • The second culver (closer to Artisan) damaged due to heavy rain may need ¼ load of B gravel

  • Generally, the road is good but will need a few loads of B gravel and some “crush” on the big hill

  • Compared to several years ago, road weathered the harsh conditions reasonably well, but may have been a little damaged by continued construction use in some areas

 Preacher’s Point

  • Hill at Artisan needs grading but otherwise good. No additional crush required but grading may indicate otherwise

  • Top of (same) hill would benefit from a load of B gravel to allow for better drainage

  • Small area between first hill the next “big” hills will improve with grading

  • Big hills are on good shape and will clean up with light grading. No additional material anticipated

  • Top of “big” hill to landing at Chapman/Roberton entrance needs attention

    • Top of hill needs a load of B to help with drainage

    • Halfway down where new culvert was replaced a few years ago needs attention

    • Drainage from the left side (east?) down has continued drainage problems when the ground is still frozen

    • Forces water over the road instead of down the side

    • BR to review solutions with BS+G

  • There is construction anticipated at Jamie and Paula’s place this summer

    • Truck turnaround is usually at the top of Roberton driveway

    • BR to discuss Jamie and Paula who are aware of the possible challenges

  • Big tree hung up on the last hill was removed by Jamie MacPherson’s contractor

    • Thank you Jamie and Paula!

  • The rest of Preacher’s held up well considering the difficult winter conditions

 Artisan Road

  • Not inspected

    • BR to inspect May 24th weekend

 General

  • BR and Josh to inspect the conditions together for Preacher’s and Miller’s in the next several weeks

  • We may have a “Road Bee” this year since we have new active and enthusiastic members!

  • There are a few more trees that may require removal

  • There are a few areas where drainage could be improved

  • There are some pot holes that may require “manual” repair (as opposed to truck loads)

    • BS+G supplies “free” gravel for pot hole repair

  • BR to provide invoice for manual road repair last fall by others ($400)

  • Anonymous donation for $400 forthcoming